Page 8 - LanHse_Part2_Increase_land_eng
P. 8

2. Establishing a long-term land reserve to support future social, economic and
            livelihood needs

               Different from other economic activities, the property market could
            not adjust its output easily upon a sudden change in demand. It is likely
            too late for the Government to respond after witnessing soaring
            property prices. Therefore, Hong Kong should establish a land reserve
            and set up a mechanism of releasing the reserved land to the market.
            An “unused” land reserve is still better than a slow and ineffective
            response.

            3. Reforming the CDA system to release the development potential of land as
            soon as possible

               In order to ensure an efficient use of precious land resources, the
            CDA system should be comprehensively reviewed and reformed, as a
            possible way to provide developable land in the short-term.

               (i) CDAs in the Future: We recommend that, except for sites involving
            Urban Renewal Authority’s renewal projects, the TPB should not
            designate other lands as CDA to reduce restrictions on development. If
            the Planning Depar tment believes a cer tain area should be
            comprehensively developed, it could specify the planning parameters in
            detail. If a proposed development project fulfils these requirements,
            separate application to the TPB would not be needed. Besides, in order
            to fully reflect the land value, CDA should not be added to future Land

            Sale Programme and tenders.

               (ii) Existing CDAs: TPB can set up a time limit (such as two years) for
            the development proposal applicant to collect a certain share of
            ownership, based on the size of a specific CDA, distribution of ownership,
            etc. If the time limit expires and the applicant still cannot collect a
            specific share of ownership, the TPB should consider breaking down the
            CDA into small zones or allow the CDA to be developed in phases. For
            sites that have been designated as CDA for a long time, the TPB should
            re-designate them into other uses using the abovementioned system.
            Besides, the Government  should bear the responsibility  of  the
            comprehensive planning in the New Territories NDAs and  re-designate
            the area’s CDA into specific uses with necessary planning parameters
            and restrictions.

               To include planning parameters into the notes of Outline Zoning Plan
            is procedurally equivalent to rezoning of land use in that relevant town
            planning procedures and seeking professional comments from relevant
            government departments are still required, which may render a smaller
            Gross Floor Area (GFA) of the development project. However, this at least
            provides a set of objective procedures to be followed and is less
            uncertain, enabling a higher chance of completion (albeit at a smaller
            scale). It is apparently superior to some cases of CDA which has been
            idle for more than two decades.






















                                                                                                                 49
   3   4   5   6   7   8   9   10   11   12   13